Simple Overview of Product Costing
SAP Product Costing deals with Plan Costing + Actual Costing of Finish products or Services.
CO comprises Product Costing + cost accounting integrated with FI.
It uses Integrated Cost Accounting.
Product costing also has 2 phases depending on the Mfg Scenarios. If you are a normal mfg comp, making goods to stock & sale, you have to first do planning of the costs of products initilally as a STD COST of a product. This is used in many phases in SAP CO acounting. In simple terms, you cost a product by different methods depending on different LIFE CYCLE phases of product. These are Development of new product. Growth stage by modifying it. Mature stage (mass prod). Decline Retirement of that product from Mfg+Mktng)
The whole CO process starts with this PLANNED costs of products & ends with totalling the STD Costs for Actual Production.
This is a simple Std cost Accounting system, in which the end result is calculating Variance bet Planned & Actual & analysing those for further corrective actions.
Product costing is well integrated to FI, but only where overhead cost accounting is used. Otherwise normally it used only for settlement.
All these actual costs of Prod are finally settled/offset to FI or Profitability segments.
SAP CO is a very vast & complicated module of all. It needs deep understanding of the subject.
This give you an overview glimpse of SAP CO.
Account Posting, Company Business Area, Controlling CO, Account Payable, Periods, Reporting, TCodes, Fixed Asset, General Ledger, Interfaces to Accounting, Interview Questions, Report Painter, Taxes
Showing posts with label Controlling. Show all posts
Showing posts with label Controlling. Show all posts
Wednesday, June 25, 2008
Difference between Cost Centers and Internal Orders
Difference between Cost Centers and Internal Orders
Would any one please tell me that
1. What is the basic difference between Cost Centers and Internal orders?
2. I understand that their functionality is same like assessments, distribution etc. then why there are divided into Cost Centers and Internal orders?
3. How the data flows from Cost Centers and Internal Orders? ie is it first into Internal orders then to Cost Centers or Vice versa? or else the data is maintained independently?
4. Does settlement means running the Assessment cycle and distibuting the costs to various cost centers from an internal order?
5. How you determine the cost of an Order or cost for an order? ie how an Cost in Order is determined?
A cost center as you will know is for fixed reporting for a long time span as part of your company structure (cost center usually = department or work center).
An internal order is used to accumulate cost for a specific project or task for a specific time period. An internal order is therefore used for a short period with a specific deadline.
Your internal order will usually settle to cost centers (and not visa versa) according to the settlement rule in the order setup.
An internal order can therefore be used to group all the expenses incurred to plan and hold a conference over a 3 month period. The order can be settled on a monthly basis to cost centers.
When the conference is finished the order can be settled finally. The cost of the conference will then be spread over 2 or more cost centers, but can be viewed in total on the internal order when needed.
It is important to understand the difference between a settlement and an assessment cycle. An assessment cycle distributes costs from one cost center to various other cost centers. You cannot assess from a cost center to an internal order nor visa versa. Assessment cycles are only between cost centers.
Settlements are used for orders. In the setup of each order is a "settlement rule". In this settlement rule you tell the system to which cost centers the cost in the order must be settled.
Typically, you will execute the following procedure at month-ends:
1. Settle all orders - this will settle all costs on orders to cost centers.
2. Run assessment cycles - Now that you have al costs against cost centers from your orders, you can start distributing costs between cost centers with assessments.
Costs are posted to an order. When you process a purchase order you post to the internal order and not to a cost center. The same applies to journals in FI. You will post the costs to the order and not to a cost center. You will then settle the order on month-ends to post to the relevant cost centers. It is very important to settle these orders otherwise FI and CO will not
balance on your system.
Internal orders can also be used as "statistical" orders. This is also specified in the setup of the order. You do not have to settle statistical orders. When posting costs, you will post to the cost center and the order simultaneously. Both have to be specified when posting journals or purchase orders against statistical orders.
Would any one please tell me that
1. What is the basic difference between Cost Centers and Internal orders?
2. I understand that their functionality is same like assessments, distribution etc. then why there are divided into Cost Centers and Internal orders?
3. How the data flows from Cost Centers and Internal Orders? ie is it first into Internal orders then to Cost Centers or Vice versa? or else the data is maintained independently?
4. Does settlement means running the Assessment cycle and distibuting the costs to various cost centers from an internal order?
5. How you determine the cost of an Order or cost for an order? ie how an Cost in Order is determined?
A cost center as you will know is for fixed reporting for a long time span as part of your company structure (cost center usually = department or work center).
An internal order is used to accumulate cost for a specific project or task for a specific time period. An internal order is therefore used for a short period with a specific deadline.
Your internal order will usually settle to cost centers (and not visa versa) according to the settlement rule in the order setup.
An internal order can therefore be used to group all the expenses incurred to plan and hold a conference over a 3 month period. The order can be settled on a monthly basis to cost centers.
When the conference is finished the order can be settled finally. The cost of the conference will then be spread over 2 or more cost centers, but can be viewed in total on the internal order when needed.
It is important to understand the difference between a settlement and an assessment cycle. An assessment cycle distributes costs from one cost center to various other cost centers. You cannot assess from a cost center to an internal order nor visa versa. Assessment cycles are only between cost centers.
Settlements are used for orders. In the setup of each order is a "settlement rule". In this settlement rule you tell the system to which cost centers the cost in the order must be settled.
Typically, you will execute the following procedure at month-ends:
1. Settle all orders - this will settle all costs on orders to cost centers.
2. Run assessment cycles - Now that you have al costs against cost centers from your orders, you can start distributing costs between cost centers with assessments.
Costs are posted to an order. When you process a purchase order you post to the internal order and not to a cost center. The same applies to journals in FI. You will post the costs to the order and not to a cost center. You will then settle the order on month-ends to post to the relevant cost centers. It is very important to settle these orders otherwise FI and CO will not
balance on your system.
Internal orders can also be used as "statistical" orders. This is also specified in the setup of the order. You do not have to settle statistical orders. When posting costs, you will post to the cost center and the order simultaneously. Both have to be specified when posting journals or purchase orders against statistical orders.
Populating Transaction Type during Order Settlement
Populating Transaction Type during Order Settlement
You have an internal order that you want to settle to a balance sheet account. This accounts field status makes the transaction type (BSEG-BEWAR) required. During settlement you receive error message F5 808 stating that this field is status initial but the field is required. This field is not available to you in the settlement rule definition. Is it possible that this field is suppressed? You could not locate a means to display or require it if so. You attempted to resolve this using a substitution that would popluate the transaction type field. However, during execution you did not hit the breakpoint you put into the user exit. How to overcome this issue?
You can change the requirement of the field in the "Field Status" of the account (Financial Accounting -> General Ledger Accounting -> Business Transaction -> G/L Account Posting -> Carry Out and Check Documents Settings -> Maintain Field Status Variants)
or
In transaction OB41 where you define posting keys and its "Field status". Both "Field Status" are maybe differents, but if in one of them the field is like "required entry" you have to change it. But if you are posting a fixed asset account, you will need this field completed because it defines the movement you are making.
You have an internal order that you want to settle to a balance sheet account. This accounts field status makes the transaction type (BSEG-BEWAR) required. During settlement you receive error message F5 808 stating that this field is status initial but the field is required. This field is not available to you in the settlement rule definition. Is it possible that this field is suppressed? You could not locate a means to display or require it if so. You attempted to resolve this using a substitution that would popluate the transaction type field. However, during execution you did not hit the breakpoint you put into the user exit. How to overcome this issue?
You can change the requirement of the field in the "Field Status" of the account (Financial Accounting -> General Ledger Accounting -> Business Transaction -> G/L Account Posting -> Carry Out and Check Documents Settings -> Maintain Field Status Variants)
or
In transaction OB41 where you define posting keys and its "Field status". Both "Field Status" are maybe differents, but if in one of them the field is like "required entry" you have to change it. But if you are posting a fixed asset account, you will need this field completed because it defines the movement you are making.
What is Production Order Settlement?
What is Production Order Settlement?
Settlement is nothing but offsetting the costs to the FI portion. CO objects carry costs, which needs to be re-assignd to the G/L accounts where it comes from.
CO never generates any data, it only tracks the same onto some objects which are analysed for definite purpose of tracking the resources which are debits in FI as costs in G/L).
In simple words, the flow is like following -
1. Direct Costs are incurred ( like material consuption ) in form of issues to prod orders. These are captured in G/L. Whenever you issue, consumption account is debited. But are also debited to prod order as
Consumption...Dr
Inventory.......Cr
2. Indirect costs are incurred in form of debits to Cost centers in G/Ls. These are actually to be allocated & absorbed in Products via Prod Orders. So it is allocated to prod orders via diff media like costing sheet or Indirect activity allocations.
Here again Prod order is debited with some amount.
When the costs are incurred these should be transffered futher when the order is closed or deliverd to stock.
So whenever you deliver the order, the follwing entry is generated-
Inventory....Dr
Cost of Prod /Mfg Variance.....Cr
If your Fin Goods' predetermined cost are same as that of actual costs incurred, there will no price difference account affected. But when your plan cost ( target cost ) & actual costs are differnet, the difference is OFFSET or SETTELLED
to price diff accout as-
Cost of Prod / Mfg Var....Dr
Price diff acc..........Cr
Note that Price diff accont is not created as COST ELEMENT.
If actual cost is less than target cost, entry would be reverse.
Settlement is nothing but offsetting the costs to the FI portion. CO objects carry costs, which needs to be re-assignd to the G/L accounts where it comes from.
CO never generates any data, it only tracks the same onto some objects which are analysed for definite purpose of tracking the resources which are debits in FI as costs in G/L).
In simple words, the flow is like following -
1. Direct Costs are incurred ( like material consuption ) in form of issues to prod orders. These are captured in G/L. Whenever you issue, consumption account is debited. But are also debited to prod order as
Consumption...Dr
Inventory.......Cr
2. Indirect costs are incurred in form of debits to Cost centers in G/Ls. These are actually to be allocated & absorbed in Products via Prod Orders. So it is allocated to prod orders via diff media like costing sheet or Indirect activity allocations.
Here again Prod order is debited with some amount.
When the costs are incurred these should be transffered futher when the order is closed or deliverd to stock.
So whenever you deliver the order, the follwing entry is generated-
Inventory....Dr
Cost of Prod /Mfg Variance.....Cr
If your Fin Goods' predetermined cost are same as that of actual costs incurred, there will no price difference account affected. But when your plan cost ( target cost ) & actual costs are differnet, the difference is OFFSET or SETTELLED
to price diff accout as-
Cost of Prod / Mfg Var....Dr
Price diff acc..........Cr
Note that Price diff accont is not created as COST ELEMENT.
If actual cost is less than target cost, entry would be reverse.
How does one Deactivate a Cost Center
How does one Deactivate a Cost Center
How does one Deactivate a Cost Center?
I can find a tcode to Activate an Inactive one but how do I deactivate a CC. Or is it so simple I cannot see it...
Marios
Go to KS02- Change Cost Center. Go to the Control Tab. Tick on the checkbox for desired transaction activity you want to lock. Any postings made against the cost center under locked activity/ies will not be allowed.
Tiongco, Jezel D.
Thank you, I knew I could block the postings but I want to somehow make the Cost Center Look Inactive.
To explain:
In transaction OKEON (Change Standard Hierarchy) I have Green Dots for Active CC's. The legend (attached) says a Red Dot is for Inactive CC's.
How do you do that?
Marios
Hi Marios, If you want to change the status to inactive, the only optioin as far as my knowledge is concerned is to change the validity period. when you double click the cost centre, details of cost centre will be displayed at the bottom by T code OKEON and you will find the status of cost centre there, just right of that you will find button to change the validity period, change the period to some future date then it turns to inactive status.
Kittu
Excellent! It works.
Thank you very much.
I had changed the Validity Period before but I set it to start right where the previous time horizon ended so looking in the future this was always active.
How does one Deactivate a Cost Center?
I can find a tcode to Activate an Inactive one but how do I deactivate a CC. Or is it so simple I cannot see it...
Marios
Go to KS02- Change Cost Center. Go to the Control Tab. Tick on the checkbox for desired transaction activity you want to lock. Any postings made against the cost center under locked activity/ies will not be allowed.
Tiongco, Jezel D.
Thank you, I knew I could block the postings but I want to somehow make the Cost Center Look Inactive.
To explain:
In transaction OKEON (Change Standard Hierarchy) I have Green Dots for Active CC's. The legend (attached) says a Red Dot is for Inactive CC's.
How do you do that?
Marios
Hi Marios, If you want to change the status to inactive, the only optioin as far as my knowledge is concerned is to change the validity period. when you double click the cost centre, details of cost centre will be displayed at the bottom by T code OKEON and you will find the status of cost centre there, just right of that you will find button to change the validity period, change the period to some future date then it turns to inactive status.
Kittu
Excellent! It works.
Thank you very much.
I had changed the Validity Period before but I set it to start right where the previous time horizon ended so looking in the future this was always active.
Requires an Assignment to a CO Object
Requires an Assignment to a CO Object
The first time Account 820290 was only created in FI as a primary expense. After that this account was created in CO too as a secondary expense and any posting will appear an error: Account 820290 requires an assignment to a CO object
Question : How to correct this account back to FI only and not to appear in co?
Note :
Account 820290 requires an assignment to a CO object
Message no. KI 235
Diagnosis
You have not defined a CO account assignment for an account that is relevant to cost accounting.
System Response
Account 820290 is defined as a cost element.
This means that you must always specify a CO account assignment.
Procedure
Enter one of the following CO account assignments
Order
Cost center / cost center/ activity type
Sales order item (for a project or cost relevant)
Project / WBS element
Cost object (Process manufacturing)
Network/ Network activities
Business process
Profitability segment
Real estate object
The posting row affected is 000, account 820290.
First, if G/L account was created in FI, you can only create primary cost element in CO.
Secondary cost element can only be created if no account exists in FI.
Second, if you created the primary or secondary cost element in CO, you have to assign CO account assignment.
You can delete cost element in CO (KO04) if dependent objects found.
Third, when you create cost element in CO, documents would be also created in ‘Cost center accounting’ and ‘Profit center accounting’ when posing in FI. If no cost element exists in CO, no related documents would be created in CCA and PCA
The first time Account 820290 was only created in FI as a primary expense. After that this account was created in CO too as a secondary expense and any posting will appear an error: Account 820290 requires an assignment to a CO object
Question : How to correct this account back to FI only and not to appear in co?
Note :
Account 820290 requires an assignment to a CO object
Message no. KI 235
Diagnosis
You have not defined a CO account assignment for an account that is relevant to cost accounting.
System Response
Account 820290 is defined as a cost element.
This means that you must always specify a CO account assignment.
Procedure
Enter one of the following CO account assignments
Order
Cost center / cost center/ activity type
Sales order item (for a project or cost relevant)
Project / WBS element
Cost object (Process manufacturing)
Network/ Network activities
Business process
Profitability segment
Real estate object
The posting row affected is 000, account 820290.
First, if G/L account was created in FI, you can only create primary cost element in CO.
Secondary cost element can only be created if no account exists in FI.
Second, if you created the primary or secondary cost element in CO, you have to assign CO account assignment.
You can delete cost element in CO (KO04) if dependent objects found.
Third, when you create cost element in CO, documents would be also created in ‘Cost center accounting’ and ‘Profit center accounting’ when posing in FI. If no cost element exists in CO, no related documents would be created in CCA and PCA
Difference Between Primary and Secondary Cost Element
Difference Between Primary and Secondary Cost Element
Explain the difference between primary and secondary cost element? With an example.
Primary cost elements are like materail costs, personnel costs, energy costs... where a corresponding GL account exists in FI..to allow costs to flow...
Secondary cost elements are like production costs, material overheads, production overheads, they can be created and administered in only CO. These are used in internal cost allocation, overhead calculation, settlement transactions., it does not flow to FI...
General - Cost Element
----------------------------------
Basically, cost element are carriers of costs.
Primary Cost Element
--------------------------------
When cost element carriers cost between FI and CO they are called Primary, the link is established GL A/c = Cost element(Primary). A question may arise as to whether all GL accounts are cost element, it again depends upon the business requirement, where COPA is active then revenue account (GL) are also cost elements, where COPA is not active then revenue account (GL) should not be made as an cost element.
Example....
Again cost of goods sold particularly in VAX (make to stock) is not an cost element, where the same COGS in VAY (make to order) is a cost element. Price Difference account should not be made as cost element.
Entry while booking expenses
Travel Expenses A/c - with Cost Centre Dr. Rs.YY
(will be a GL A/c and cost element) - entries flows to CO thru FI
To Cash A/c Cr. Rs.YY
Secondary Cost Element
-------------------------------------
When cost element carries cost with in CO, then they are called secondary cost element.
Example.... - Take Product Costing
---------------------------------------------------
On manufacture of the goods the cost of the above product (production order) is arrived at accumulating material cost + operational cost + overheads (%), additive cost if any.
The cost of operation is accumulated in cost centre be it production / production service / service cost centres, while booking FI entries.
Those operational cost has to be allocated to production order based on operational activities carried on and its cost involved in it. Those operation activities in CO are termed as activity types and has to link the same in KP26 with rates and cost centre (ie., sender cost centre and receiver production order).
In order to find the production order cost, the allocation of cost from sender cost centre to production order for the operational activities carried on and its cost associated with it, have to be loaded, hence in CO the cost centre allocate that portion of operational cost to production order, and this cost is carried by a cost element (since there are no FI involvement and entries are flowing within CO by crediting sender cost centre and debiting receiver production order a cost element has to be created.... say "Operational Cost - Activity" the entry will be
Operational Cost - Activity (Production Order) Dr Rs.XX
To Operational Cost - Activity (Cost Centre) Cr Rs.XX
The entries are with in CO. And the cost element created is secondary since it does not has an link with GL Account in FI correspondingly.
In CO the production order and cost centre are co object including but not limited to.
Explain the difference between primary and secondary cost element? With an example.
Primary cost elements are like materail costs, personnel costs, energy costs... where a corresponding GL account exists in FI..to allow costs to flow...
Secondary cost elements are like production costs, material overheads, production overheads, they can be created and administered in only CO. These are used in internal cost allocation, overhead calculation, settlement transactions., it does not flow to FI...
General - Cost Element
----------------------------------
Basically, cost element are carriers of costs.
Primary Cost Element
--------------------------------
When cost element carriers cost between FI and CO they are called Primary, the link is established GL A/c = Cost element(Primary). A question may arise as to whether all GL accounts are cost element, it again depends upon the business requirement, where COPA is active then revenue account (GL) are also cost elements, where COPA is not active then revenue account (GL) should not be made as an cost element.
Example....
Again cost of goods sold particularly in VAX (make to stock) is not an cost element, where the same COGS in VAY (make to order) is a cost element. Price Difference account should not be made as cost element.
Entry while booking expenses
Travel Expenses A/c - with Cost Centre Dr. Rs.YY
(will be a GL A/c and cost element) - entries flows to CO thru FI
To Cash A/c Cr. Rs.YY
Secondary Cost Element
-------------------------------------
When cost element carries cost with in CO, then they are called secondary cost element.
Example.... - Take Product Costing
---------------------------------------------------
On manufacture of the goods the cost of the above product (production order) is arrived at accumulating material cost + operational cost + overheads (%), additive cost if any.
The cost of operation is accumulated in cost centre be it production / production service / service cost centres, while booking FI entries.
Those operational cost has to be allocated to production order based on operational activities carried on and its cost involved in it. Those operation activities in CO are termed as activity types and has to link the same in KP26 with rates and cost centre (ie., sender cost centre and receiver production order).
In order to find the production order cost, the allocation of cost from sender cost centre to production order for the operational activities carried on and its cost associated with it, have to be loaded, hence in CO the cost centre allocate that portion of operational cost to production order, and this cost is carried by a cost element (since there are no FI involvement and entries are flowing within CO by crediting sender cost centre and debiting receiver production order a cost element has to be created.... say "Operational Cost - Activity" the entry will be
Operational Cost - Activity (Production Order) Dr Rs.XX
To Operational Cost - Activity (Cost Centre) Cr Rs.XX
The entries are with in CO. And the cost element created is secondary since it does not has an link with GL Account in FI correspondingly.
In CO the production order and cost centre are co object including but not limited to.
SAP Controlling FAQ
SAP Controlling FAQ
CONTROLLING
Controlling: Controlling provides you with information for management decision-making. If facilitates co-ordination, monitoring and optimization of all process in an organization.
Features of Controlling: Cost Center Accounting, Activity Based Accounting, Internal Orders, Product Costing, & Profitability Analysis.
Controlling Area: Organization unit that represents a closed system Used for accounting purposes.
You can assign one or more company codes to one controlling area.
If you assign more than one company code to one controlling area, then you need to note the following.
1) Consistent Chart of a/c’s (Treat each cost element in all company codes in same way).
2) The Operative fiscal year variants in the company codes must match the fiscal year variant in controlling area.
3) You should execute period end closing in controlling for all company codes at same time.
4) The system only post reconciliation posting across company codes without taxes, which means that it cannot automatically create invoice.
5) Maintain controlling area - OKKP .
6) Maintain no. ranges for controlling documents - KANK
7) Maintain versions - OKEQ
COST ELEMENT ACCOUNTING
Cost Elements: Cost Elements Describe the origin of costs. Cost element classifies the organization valuated consumption of production factors within a controlling area.
Primary Cost Elements: These arise through the consumption of productions factors that are sourced externally. Primary cost elements are used for direct posting and must be accompanied in GL a/c’s in FI.
T-code : KA02 : The categories are follows
1) General primary cost element, 03 - Imputed cost element percentage method 4 - Imputed cost element, target = Actual Method, 11- Revenue elements, & 12 - sales deductions.
Secondary Cost Elements: Cost elements arise through the consumption of production factor’s that are provided internally i.e., by enterprise itself. Secondary cost elements are used strictly for internal controlling posting like assessments and settlements. T-code - ka06
Category: 12 - internal settlements, 31 - Result analyses, 41 - overhead’s, 42 - assessments etc. Cost Element Group - kah1
COST CENTER’S
Cost Center’s: Organizational Unit within a controlling area that represents a defined location of cost incurrence. The definition can be based on 1) Functional Requirement, 2) Allocation criteria, 3) Physical location and 4) Responsibilities for cost.
Change Cost center hierarchy - OKEON
Creation of Cost Center - KS01
Distribution: Was created to transfer primary costs from a sender cost center to receiving controlling objects. Distribution is primary cost elements.
Define Distribution - KSV1
Execute “” - KSV5
Assessment: Was created to transfer primary and secondary costs from a sender cost center to receiving controlling objects.
During assessment, the original cost elements are summarized into assessment cost elements (secondary cost element, category=42).
Define Assessment - KSU1
Execute Assessment - KSU5
Activity Types: Categorizes productions and services activities provided by a cost center to the organization and used for allocating costs for internal activities to the originates of the costs.
Creation of Allocation Cost elements - KA06
Creating/Maintaining the Activity types - KL01
Statistical key figures: Are used as the basis (tracing factor) on which to make allocations (assessments & distributions) and to analyze structural key figures.
CONTROLLING
Controlling: Controlling provides you with information for management decision-making. If facilitates co-ordination, monitoring and optimization of all process in an organization.
Features of Controlling: Cost Center Accounting, Activity Based Accounting, Internal Orders, Product Costing, & Profitability Analysis.
Controlling Area: Organization unit that represents a closed system Used for accounting purposes.
You can assign one or more company codes to one controlling area.
If you assign more than one company code to one controlling area, then you need to note the following.
1) Consistent Chart of a/c’s (Treat each cost element in all company codes in same way).
2) The Operative fiscal year variants in the company codes must match the fiscal year variant in controlling area.
3) You should execute period end closing in controlling for all company codes at same time.
4) The system only post reconciliation posting across company codes without taxes, which means that it cannot automatically create invoice.
5) Maintain controlling area - OKKP .
6) Maintain no. ranges for controlling documents - KANK
7) Maintain versions - OKEQ
COST ELEMENT ACCOUNTING
Cost Elements: Cost Elements Describe the origin of costs. Cost element classifies the organization valuated consumption of production factors within a controlling area.
Primary Cost Elements: These arise through the consumption of productions factors that are sourced externally. Primary cost elements are used for direct posting and must be accompanied in GL a/c’s in FI.
T-code : KA02 : The categories are follows
1) General primary cost element, 03 - Imputed cost element percentage method 4 - Imputed cost element, target = Actual Method, 11- Revenue elements, & 12 - sales deductions.
Secondary Cost Elements: Cost elements arise through the consumption of production factor’s that are provided internally i.e., by enterprise itself. Secondary cost elements are used strictly for internal controlling posting like assessments and settlements. T-code - ka06
Category: 12 - internal settlements, 31 - Result analyses, 41 - overhead’s, 42 - assessments etc. Cost Element Group - kah1
COST CENTER’S
Cost Center’s: Organizational Unit within a controlling area that represents a defined location of cost incurrence. The definition can be based on 1) Functional Requirement, 2) Allocation criteria, 3) Physical location and 4) Responsibilities for cost.
Change Cost center hierarchy - OKEON
Creation of Cost Center - KS01
Distribution: Was created to transfer primary costs from a sender cost center to receiving controlling objects. Distribution is primary cost elements.
Define Distribution - KSV1
Execute “” - KSV5
Assessment: Was created to transfer primary and secondary costs from a sender cost center to receiving controlling objects.
During assessment, the original cost elements are summarized into assessment cost elements (secondary cost element, category=42).
Define Assessment - KSU1
Execute Assessment - KSU5
Activity Types: Categorizes productions and services activities provided by a cost center to the organization and used for allocating costs for internal activities to the originates of the costs.
Creation of Allocation Cost elements - KA06
Creating/Maintaining the Activity types - KL01
Statistical key figures: Are used as the basis (tracing factor) on which to make allocations (assessments & distributions) and to analyze structural key figures.
Cost Component Split In FICO
Cost Component Split In FICO
Can someone brief what is cost component split? What config is to be done?
In addition to standard iteration, price calculation enables you to calculate prices as a cost component split. This means that the output price of an activity type can be split into a maximum of 40 cost components. These cost components represent either:
Individual cost components (such as wages, salaries, or operating supplies) or the costs of complete cost centers (such as energy or maintenance cost centers).
The cost component split enables you to analyze which cost components are contained in the output prices of the activity types.
You can then control cost elements, cost element groups, and also entire cost centers in cost component splits. The corresponding cost center costs and the costs of the cost centers providing the activity are channeled into this cost component split. For example, if you have assigned the salary cost element to component 1 (salaries), then the system displays the salaries (for example, for a production cost center) in this cost component. If a plant maintenance cost center provides services to the production center, then the salaries for the plant maintenance cost center are assigned to this cost component.
Cost center splitting apportions activity independent costs to the activity types of the cost center. It does this by multiplying the total of the activity independent costs by the equivalence number of the activity type, and then dividing by the sum of the equivalence numbers. So if there are two activities, one with equivalence number 1 and the second activity has an eqivalence number of 2, then 1/3 of the activity independent costs will be apportioned to activity one, and 2/3 will be apportioned to activity two.
Activity independent costs are always fixed, so any variable costs will need to be planned as activity dependent costs.
Planned cost center splitting happens automatically when calculating the activity price. You can view what costs will be apportioned during activity price calculation by clicking on the Splitting menu item.
I've ran cost splitting against one cost centre. For this cost centre I know the planned activity rate (per hour) and the planned quantity (in hours) but the target cost calculated for the activity is slightly different to the result of these two multiplied together.
Is this calculation correct please?
Planned act. qty in period @ planned act. rate for period = target costs
If you have only one Activity for the cost center, then you do not need to run splitting. Just run activity price calculation. Splitting is required only if you are allocating the same costs to 2 or more activities.
The calculation is generally right. The other thing to check will be rounding of the time (mins/hours) and value.
Can someone brief what is cost component split? What config is to be done?
In addition to standard iteration, price calculation enables you to calculate prices as a cost component split. This means that the output price of an activity type can be split into a maximum of 40 cost components. These cost components represent either:
Individual cost components (such as wages, salaries, or operating supplies) or the costs of complete cost centers (such as energy or maintenance cost centers).
The cost component split enables you to analyze which cost components are contained in the output prices of the activity types.
You can then control cost elements, cost element groups, and also entire cost centers in cost component splits. The corresponding cost center costs and the costs of the cost centers providing the activity are channeled into this cost component split. For example, if you have assigned the salary cost element to component 1 (salaries), then the system displays the salaries (for example, for a production cost center) in this cost component. If a plant maintenance cost center provides services to the production center, then the salaries for the plant maintenance cost center are assigned to this cost component.
Cost center splitting apportions activity independent costs to the activity types of the cost center. It does this by multiplying the total of the activity independent costs by the equivalence number of the activity type, and then dividing by the sum of the equivalence numbers. So if there are two activities, one with equivalence number 1 and the second activity has an eqivalence number of 2, then 1/3 of the activity independent costs will be apportioned to activity one, and 2/3 will be apportioned to activity two.
Activity independent costs are always fixed, so any variable costs will need to be planned as activity dependent costs.
Planned cost center splitting happens automatically when calculating the activity price. You can view what costs will be apportioned during activity price calculation by clicking on the Splitting menu item.
I've ran cost splitting against one cost centre. For this cost centre I know the planned activity rate (per hour) and the planned quantity (in hours) but the target cost calculated for the activity is slightly different to the result of these two multiplied together.
Is this calculation correct please?
Planned act. qty in period @ planned act. rate for period = target costs
If you have only one Activity for the cost center, then you do not need to run splitting. Just run activity price calculation. Splitting is required only if you are allocating the same costs to 2 or more activities.
The calculation is generally right. The other thing to check will be rounding of the time (mins/hours) and value.
Subscribe to:
Posts (Atom)
Archive
-
▼
2009
(116)
-
▼
February
(49)
- Correcting Mistakes Posting and Clearing
- Posting Partial Payments Posting and Clearing
- Posting Residual Items Posting and Clearing
- Displaying the Open Items Posting and Clearing
- Explaining Differences Posting and Clearing
- Processing Open Items as per Payment Advice Note P...
- Noting Open Items as Payment Advice Notes Posting ...
- Clearing Between Company Codes Posting and Clearing
- Clearing Open Items in Foreign Currency Posting an...
- Clearing Mixed Currency Open Items in Local Curren...
- System Translates All Amounts to Local Currency Du...
- System Uses Historical Amounts in Local Currency D...
- Clearing Open Items with a Future Posting Date Pos...
- Posting and Clearing
- The Clearing Process
- Entering the Document Header
- Entering Line Items
- Choosing the Open Items
- Choosing Specific Items for Clearing
- Clearing Between a Customer and Vendor
- FI/CO Interview Questions
- SAF FI Technical Interview Questions I
- SAF FI Technical Interview Questions II
- SAP FI/CO Sample Questions and Answers I
- SAP FI/CO Sample Questions and Answers II
- FI Errors and Probable Solutions
- SAP FI FAQs
- SAF FI Frequently Asked Questions I
- SAF FI Frequently Asked Questions II
- Questionnaire with Answers for SAP FI
- SAP Questions and Answers for SAP Financial
- SAP Integration of FICO with Other Modules
- SAP FICO Internal Correspondence
- SAP FICO Internal Documents
- SAP FICO Requesting Internal Documents
- SAP Requesting Internal Docs and Doc. Extracts Wit...
- Requesting Internal Documents when Not in a Functi...
- Editing Correspondence Requests Internal Correspon...
- Maintaining Correspondence Requests Internal Corre...
- Deleting Correspondence Requests Internal Correspo...
- Printing Correspondence Internal Correspondence
- Printing Correspondence with the General Print Pro...
- Printing Internal Documents Without a Request Inte...
- Chart of Accounts and Account List Internal Corres...
- Account Statement Internal Correspondence
- Listing Programs for Evaluations Internal Correspo...
- SAP FICO Internal Correspondence
- SAP FICO Internal Documents
- SAP Requesting Internal Documents
-
▼
February
(49)